The J72 saga
carries on; one of the new motors gave up after 20 minutes running on DC at
only 6 Volts. I have resigned myself to the fact that the J72 is a pig and I
will get one the new releases when they are out. To day I have a go at ultra
low relief industrial type units to fill a void by Arelesworth Station. 5 units
printed onto photo paper mounted onto 2mm card.
About Me

- Pix Valley
- From Rugby, Warwickshire; Went to Marlborough Secondary School; Studied at Rugby College of Engineering Technology; Worked at HM Forces - British Army; Studied at Royal School of Military Engineering; Former Maintenance Technician at International Computers Limited; Former IT Support at GlaxoSmithKline Pharmaceuticals Ltd; Lives in Letchworth
Pages
Thursday, 27 August 2015
Sunday, 23 August 2015
Pixvalley railway update
A slight tweak with the layout at the side of the
shed, and the installation of a coal staithe for the steam locos which seem to
be in abundance on this line. I have finished the rough blanks for the terminus
at Western Hill all 16 feet of platform I have three stations on the Pixvalley railway left to right on
the plan Western Hill next Rushmoor and finally Arelesworth


Friday, 21 August 2015
Q1 tender mod
Having checked
EBay for a replacement X9221
Hornby Spare Tender Chassis Bottom I decided to cut mine to raise the height
of the coupling bar. The photos are self explanatory the only thing to note is
the fact I had to open up the fishtail so the NEM pocket fits. The result is
the coupling is now about 1.5mm higher.
While I was doing the
tender mod I was pondering of making some magnetic coupling using 2mm neodymium
magnets to make uncoupling easier. See sketch
Tuesday, 18 August 2015
a bit of a downer
I thought I would chip Pug No2 brand new chip out of the box grey
cable not connected ah rats more fiddly soldering!
Monday, 10 August 2015
And finally it’s all coming together
I actually got around to making an enclosure for the main DCC control box, while Stobart Rail attends to the river bank!
Thursday, 6 August 2015
The end of the run.
Last two 4
foot boards constructed and the major building is finished. Just need to make
the uprights and set all the levels. BTW the level is 1200 mm long!
Monday, 3 August 2015
And it grows
At long last
my layout board fixing bolts and dowels arrived today. Two more boards attached
to the layout another two 4 foot boards to construct then the major building is
finished.
Subscribe to:
Posts (Atom)