From Rugby, Warwickshire;
Went to Marlborough Secondary School;
Studied at Rugby College of Engineering Technology;
Worked at HM Forces - British Army;
Studied at Royal School of Military Engineering;
Former Maintenance Technician at International Computers Limited;
Former IT Support at GlaxoSmithKline Pharmaceuticals Ltd;
Lives in Letchworth
At long last
my layout board fixing bolts and dowels arrived today. Two more boards attached
to the layout another two 4 foot boards to construct then the major building is
finished.
Very nice,You could have a stright line and second bridge as a goods through line to bypass the station or even add a loop and some kind of industry?
ReplyDelete