25/04/2020
All
platforms now have their brick face paper attached. Fishplates arrived
yesterday allowing me to re-lay the track and paint the rust and sleepers I
shall mist a coat of black when the ballast dries out. 50mm masking tape stuck
down where the platform will sit trimmed to the size of the platform footprint.
This is a better way then ballasting with the platform in situ they don’t get
stuck if they are needed to be removed at a later date. Ballast was laid this
afternoon wetted and soaked in 50% PVA and water. I only used the cheapest from
the pound shop it sets rock hard as my chisel will testify. That’s it for today
No comments:
Post a Comment