About Me

My photo
From Rugby, Warwickshire; Went to Marlborough Secondary School; Studied at Rugby College of Engineering Technology; Worked at HM Forces - British Army; Studied at Royal School of Military Engineering; Former Maintenance Technician at International Computers Limited; Former IT Support at GlaxoSmithKline Pharmaceuticals Ltd; Lives in Letchworth

Pages

Saturday, 13 December 2014

Phase two

Today I laid the track on the second phase of the layout and fitted the copper clad sleepers where the joins will be soldered and cut the track, next the point motors were fitted and tested tomorrow the last point motor to be fitted and tested




2 comments:

  1. Nice work, A lot neater than mine. Under side of mine is like spagetti

    ReplyDelete
  2. Bit of a halt at the moment with the wiring, I’m waiting for the purple wire to turn up from Fleabay

    ReplyDelete