My metal sections arrived from Birmingham and I had them cut to size
+.5mm to allow for machining. Unfortunately the weather is not warm enough for
me to venture up to my workshop to machine the parts for assembly.
Just to give you an idea of where I am going with this I enlisted the help of “double sided tape”. The square section will have a 6 mm hole bored through so the eight assemblies can be mounted on two parallel arms four each side. Each side electrically isolated from each other.
I like.........plus it has a great feel good factor when it's all your own work?
ReplyDelete