Well hello
again! The single pulley hook is finished and the jib runner has its toolboxes.
Finally the 2.5mm socket head screws arrived so I have managed to finish the
winding drums as you can see the hex on the socked head is aligned up with a
hole in the side frame a small key can be used the tension the ropes thanks to CaptBeetroot for the tip on the Carp line its super fine
and very flexible. I have to do a little more work on the winding drums especially
the split hoist drum.
Ooops the drums are in the wrong location doh!
It really is looking good. And we learn by our mistakes..or errors...Glad that the Carp line was good. I have used it on a few projects...
ReplyDeletethanks mate the drums were only dropped in to test the fit they are in the correct location now. i'm aiting for the solvent to dry on the locking slides.
ReplyDelete