Today was
spent fabricating the hinge mechanism for the winding gear cover, updating my aviation
database and shopping, First I had
to make a double hinge support block to attach the winding gear cover to the
jib block support frame, two 1.18mm holes are drilled though the support block
for the pivot rods.
Next two channels
are cemented to the underside of the winding gear cover to allow horizontal
movement of the support block when the jib is raised. Finally a length of rod
was glued though the upper hole in the block to engage in the channel.
A little
trimming of the lower rod is needed and I am very pleased with the way the
action works.
Well that is
all I propose to do this year so to all have a very happy new year.
Ingenious..Looking forward to seeing the finished crane
ReplyDelete