Something I have been planning for a while now is the platform
extension at Arlesworth. In a major feat of engineering the whole of the
platform was lifted and moved 30 ft to allow a new section to be inserted. Now
I can eventually install some signalling but more of that later I have some
research on type and positioning of the signals.
Nice Job...
ReplyDelete