The issue with cleaning rolling stock wheels is having to rotate the wheel to remove the dirt. Enter the Uber Wheel Cleaner.. Ta da. an old horn be power bogie was the basis for this devise, I removed the wheels from both axels and replaced two wheels with traction tyre groves revered flanges outwards onto one axle. a suitable 'O' ring is fitted on each wheel.
About Me

- Pix Valley
- From Rugby, Warwickshire; Went to Marlborough Secondary School; Studied at Rugby College of Engineering Technology; Worked at HM Forces - British Army; Studied at Royal School of Military Engineering; Former Maintenance Technician at International Computers Limited; Former IT Support at GlaxoSmithKline Pharmaceuticals Ltd; Lives in Letchworth
Pages
Sunday, 29 May 2022
Uber Wheel Cleaner
the motor is connoted to flying leads to connect to a suitable controller.
Thursday, 17 February 2022
Jeep CKD delivery in a packing case
During World War 2 the United States transported JEEP's in packing cases. I thought i should replicate this as a load for my CONFLAT!
Saturday, 22 January 2022
Delivery of the support coach for “Tornado”
Arriving at Rushmoor depot a Mk1 Brake 2nd Class Coach BSK recently fitted with new “commonwealth” bogies and new wheel sets. Michael Portillo is waiting on Rushmoor platform to interview the “fat controller”
Unfortunately Tornado’s tender bogie derailed reversing into the station delaying the interview. However the derailment was soon fixed.
Sunday, 2 January 2022
Continuation of the rebuild of “Pacer Set” new year update
02/01/2022 moving on all wiring soldered to DCC
socket, tested with a trusty 9 volt battery. I’m happy it’s working within
expected parameters. Next stage painting interior populating passengers the on
to the second car!
Tuesday, 28 December 2021
Continuation of the rebuild of “Pacer Set” from Greater Manchester Passenger Transport Executive
24/12/2021 Motor resembled into drive train and motor and pickup wires soldered to chassis.
27/12/2021 resistors soldered to DCC socket and
insulated with colour coded heat shrink micro LED’s threaded into light cluster
aperture.
Wednesday, 22 December 2021
Rebuild of “Pacer Set” from Greater Manchester Passenger Transport Executive
Today 22/12/2021 the decoder socket boards eventually arrived. Square bearers to support the decoder socket board were cut from 4.8mm square evergreen strip. Drilled in the centre for small a self tapping screw.
Decoder socket board screwed in place and the whole assembly glued to the interior moulding.
Thursday, 9 December 2021
Delivery of a “Pacer Set” from Greater Manchester Passenger Transport Executive
Pix Valley is expecting a delivery of a “Pacer Set” 55554 and 55604 from Greater Manchester Passenger Transport Executive in the next few days. Unfortunately Storm Barra has delayed the departure of the convoy. More news when the set arrives at Pix valley. Eventually today 10/12/2021 55554 and 5560 arrived at Pix Valley, they will need stripped cleaned and tested before entering service.
Overhaul commenced today 11/12/2021 stripped and measured for a decoder socket board
Subscribe to:
Posts (Atom)