08/12/2023
Still no sign of the servo mounts on order from fair price models 8 days now 1st class Royal Fail! As I had one mount for evaluation purpose I decided to complete and test the first module as a pattern article, I’m pleased with the result mounting on the layout will only involve drilling one hole between the sleepers in the desired location and fixing the module underneath using 2 screws.

09/12/2023
Servo mounts delivered this morning sent 30th November 1st class Royal Fail!

10/12/2023
Servo mounts assembled and ramp modification completed.

11/12/2023
The 6 brass mounting plates that were previously cut and drilled have now got the 3.2mm square tube guide for the ramp lift rod soldered and 6 lengths of 2.4mm square for the ramp lift rod cut to size. That’s all for today