From Rugby, Warwickshire; Went to Marlborough Secondary School; Studied at Rugby College of Engineering Technology; Worked at HM Forces - British Army; Studied at Royal School of Military Engineering; Former Maintenance Technician at International Computers Limited; Former IT Support at GlaxoSmithKline Pharmaceuticals Ltd; Lives in Letchworth

Pages

Sunday, 26 July 2015

Day 4 Power sockets



Every good man cave should have adequate power for man and his toys, I have 24!



Friday, 24 July 2015

Day 3 Power completed

All the power runs finished and tested stock shelve fully screws down. Tomorrow a tidy of all the work in progress tools. GoPro stills show every thing bent due to the ultra wide angle lens








Wednesday, 22 July 2015

Moving on a little further.


I'm back from The Royal International Air Tattoo the weather was brilliant it rained during the night leaving the daytime dry and hot. The caravan is unpacked and cleaned caught up on my emails and downloaded the photos.


Just a small amount or work done on the loft today another bracket on the far wall and a vertical support on the long side.


Day 2
Final vertical support in place and all the horizontal supports cut to size next it’s replacing the curved track that was removed to allow the extension piece to be fitted.




Marc some of your ballast has fallen out! 




Monday, 13 July 2015

Moving on.


Dry run for fixing the layout, battens fixed to the plasterboard horizontal battens and a cantilever support beam attached to the upright brace.





Checked out the clearance for the loft ladder. 



That’s all now until I get back from The Royal International Air Tattoo.

Thursday, 9 July 2015

Man Cave PT 7.

All signed off and lighting and power installed. Now I have a workbench and shelving.